Glass Flooring

Product Image

Application Areas

Product Features

Glass floors are made with transparent glass when it is useful to view something from above or below .In either case, toughened glass is usually chosen, for its durability and resistance to breakage. Glass as a flooring material is used in both residential and commercial structures. Special hollow glass blocks known as 'glass pavers" are often used in combination with a metal frame. Glass floors are often lit from below with natural or artificial light, or may be treated as ordinary floor surfaces illuminated from above. Glass flooring is a new concept in India that is gaining momentum among builders and home-owners. They provide the perfect mix of aesthetics and strength and brightens up tight spaces. Glass flooring offers endless design possibilities for architects. It can be combined with ceramic or porcelain tiles as accent glass tiles for a breathtaking and an expensive look.

PRODUCT FEATURES:

❖ Glass flooring adds a touch of glamour to the building and gives a stunning elegance to the building.

❖ Glass tiles are durable and are quite sturdy.

❖ Glass is generally bacteria and dirt-resistant. They are moisture-resistant and hence they won’t gather mold. It is ideal for those who suffer from allergies.

❖ Glass is environment-friendly and can be recycled.

❖ Glass is impervious to water, and hence when spilled can be easily wiped-off.

❖ Glass floors add a beautiful feature to a home and are often novel focal points for exotic balconies and mezzanines.

❖ Allows light to pass through.

❖ Can reduce lighting costs and provide unique views.

❖ Stunning design perspective

❖ Higher temperature resistance

❖ Good chemical resistance

❖ Resistance to thermal shocks

Product Information

PURPOSE:-.

● To provide a see through,smooth ,clean ,impervious floor.

● It also provides a walking surface and working surface.

● Enhance the beauty of the floor.

APPLICATION AREAS:-

● Perfect in your home as well as commercial application.

● Office

● Shopping malls

● Outdoor sidewalks and pavements

● Museum

● To study foreshortening and scientific studies of locomotion

● Windowless hallways

● Glass bottom boats

● Star hotels

● Restaurants

● Corporate headquarter

● Clubs and some private residence

● Interior sky floor system

● Interior spaces

● Spiral staircases

Technical Information

INSTALLATION METHOD:

Prepare the structural opening

● Verify placement of joists and perimeter conditions according to the approved project drawings. Next, prepare the perimeter by removing debris and applying any required perimeter sealants or other waterproofing.

Install anchor blocks, joists and desiccant

● Consult the supplied project drawings to determine the recommended method for securing the anchor blocks to the surrounding structure.

● Then, install the primary joists, desiccant and secondary joists. Before installing the fixing screws, check to make sure all openings and framing are square and straight. All screws should be hand tightened until snug. Avoid over-tightening.

Gasket and seal

● Apply a silicone-compatible sealant where the joints and silicone gasket meet. This will typically be at the top and bottom of each joist. Then, install a bead of silicone at each joist intersection. This will help create an airtight chamber free of internal moisture.

Install fire-resistant-rated glazing

● Before installing fire-resistant-rated glazing, check to ensure fire and heat blocking materials, such as intumescent tape, are in place.

● Next, install perimeter spacers around the outside of the system. As fire-resistant-rated glass is typically heavy, this helps ensure even glazing pressure on the glass and aids in preventing glass breakage.

● Once the perimeter spacing and temporary bars have been set, install the pressure bars with the supplied mounting nuts. While the nuts need to be tight enough to create a seal between the glass and silicone gasket on the joist beams, take care to not over tighten them to avoid glass breakage.

● After all pressure plates have been installed, use the supplier's recommended fire barrier caulk and insulation plugs to fill holes in the pressure bars.

Install top surface glazing

● The top surface glazing typically can be made up of one or two parts. If it consists of two components—a structural layer and a walking surface layer—glaze the structural layer first. Start by ensuring the silicone gasket is clean and clear of errant material. Place the structural glass onto the gasket, keeping an even joint between all glass pieces.

● A fire-rated glass floor system's walking surface can provide slip resistance, while protecting the structural layer from damage.

● Next, place the walking surface onto the structural layer. If it includes a frit or other non-slip surface, check to make sure it is face-up and that any patterns are oriented correctly. Lastly, seal the gaps between the glass with silicone, tooling silicone into the gap.

INSTALLATION MATERIALS:

❖ Measure tape

❖ Panel lifter

❖ Tile suction cup

❖ Puller

❖ Glass Panel

❖ Finishing powder coating

❖ Hinges

❖ Brackets

❖ Glass cleaning product

❖ Setting tools

❖ Adhesive tape

Maintenance and Warranty

MAINTENANCE:-

DO'S:-

⮚ While installing glass flooring you should check for cracks

⮚ Adhesive tape should be applied in case of cracks.

⮚ Evaluate the amount of foot traffic in particular space while going in glass floor

⮚ To avoid buildup of dirt and grime that can scratch the top surface glass.

⮚ Do wash the floor with soft ,clean and grit free cloths and small amount of mild soap detergent

⮚ Do rinse the glass with clean water

⮚ Use cleaning solution that specially state they are safe for glass cleaning

DONT'S:-

⮚ Don’t use steam jets and abrasives for cleaning

⮚ Don’t use strong acidic or alkaline detergent

⮚ Don’t apply excessive pressure on the glass.

⮚ Don’t scrub with sponge

⮚ Avoid using tapes or adhesive glass panes as they can damage the surface.

⮚ Do not store or place other material in contact with the glass.

WARRANTY: 1 year for colour change

SUBBASE REQUIREMENTS: DRY , LEVELLED, NO DIRT OR GRITS, NO CRACKS, FIRM

MEASUREMENT METHOD AND UNIT:

STEP 1: Measure the area of the room. Use the tape measure to measure the length and then the width of the room. Making a note of measurements.

STEP 2: Calculate the square footage.

Step 3: Calculate amount of flooring needed.

UNIT: SQ.FT

Installation Video