Diffusers
Product Image
Application Areas
Product Features
Diffusers quickly and easily eliminates floor to ceiling standing waves. They reduce flutter echo while maintaining a warm room sound.
PRODUCT FEATURES:
- Light weight, very easy to cut, handle and apply
- No wall and ceiling damage, no framework required
- Big space can be treated swiftly
- Low Maintenance, easy cleaning and durable
- odorless
- Hygienic, anti -microbial and non -carcinogenic
- Available in different colors and designs.
Product Information
PURPOSE:-
It can be used to effectively reduce distinct echoes and reflections while still leaving a live sounding space
APPLICATION AREAS:-
- Recording Studios
- Home Theaters
- Areas where more consistent sound levels across a wide frequency range are desired
- Auditoriums/Lecture Halls
- Band/Choral Rehearsal Rooms (Walls/Ceilings)
- Music Performance Spaces
Technical Information
INSTALLATION METHOD:
- Mounting Diffusers to the Wall
- 1. Attach Z-Bars for top clips to the wall using appropriate fasteners (fasteners are not included) making sure they are aligned with the top clips on the diffuser. The top of each Z-Bar should be 1/8” below the desired diffuser height. Be sure to allow 1” minimum clearance above the top of each Z-Bar for clip attachment.
- Attach bottom and side L Clips (see drawings for clip locations) to the wall using appropriate fasteners (fasteners not included). L Clips should be 1/8” inside the exterior edge of the diffuser.
- Install the diffuser by dropping the top clips on to the Z-Bar so they are fully engaged.
- Be sure the exterior edge of the diffuser overlaps and hides the bottom and side L Clips. Attach the diffuser to the side and bottom L Clips with #8 x 3/4” Screw
Maintenance and Warranty
MAINTENANCE:-
- Remove day-to-Day Soil Ordinary dirt and smudges with a mild soap, warm water, and, if necessary, a hard bristle brush to remove dirt from the crevices of deeply textured patterns.
- Clean from bottom of wall upward.
- Rinse thoroughly with clean water from the top down using a sponge
WARRANTY: 1 year for color fade
SUB-BASE REQUIREMENTS: DRY, LEVELED, NO DIRT OR GRITS, NO CRACKS, FIRM
MEASUREMENT METHOD AND UNIT:
- You need to measure the area you are covering.
- Measuring the area is fairly easy if you have a square or rectangular wall, as you can easily measure two sides to obtain the square foot.
- AREA=LENGTH X BREADTH ,Consider 5% for wastage
Shade Card : Available on Request
Videos : Available on Request